GROUNDING THE POSSIBILITY OF RECONSTRUCTION THE UNDERGROUND MINE TRANSPORT SYSTEM BY TRANSITION TO PERSPECTIVE ORE TRANSPORTATION PROCESSES (ON THE EXAMPLE OF+170 M LEVEL OF THE KUKISVUMCHORSKY DEPOSIT)

Authors

  • Evgeny Gromov Mining Institute, KSC RAS

DOI:

https://doi.org/10.18454/2313-1586.2017.01.038

Keywords:

transport scheme, deposit, underground mining, technical-and-economic comparison, expenses discounting, dump truck, locomotive transport, the “Rail-Veyor” crushing and conveying complex

Abstract

The range of problems of maintaining the underground transport systems efficiency during the development long-term exploration deposits is presented. . On the example of mining block
7-10 +170m level of the Kukisvumchorsky deposit
ore reserves of the United Kirovsky mine of JSC
«Apatite» rational modernization schemes of ore
transportation are worked out by transition to alternative modes of transport. For the proposed variants technical-and-economic comparison with the
existing transportation scheme is performed. The
expediency of the “Rail-Veyor” innovative
transport system is grounded; it presents a combination of conveyor and rail transport.

Published

2017-03-31

Issue

Section

GEOTECHNOLOGY